Ankara – İzmir High-Speed Rail 3D SCADA: Traffic Control Demo
A 624 km line, 14 trains, ETCS signalling, the Afyonkarahisar interlocking, passengers and traction power — on one screen, in the browser
Location
Fictional line · Ankara – Afyonkarahisar – İzmir, Türkiye
Year
2026
Scope
3D modelling (Blender): trains, station, catenary, signals · Real-time web interface · Train dynamics, timetable and ETCS block simulation · Electronic interlocking: routes, points, signal locking · Passenger flow and 25 kV traction power model · Line map, line diagram, graphic timetable · Mobile and touch support · TR/EN localisation
01 · The challenge
Railway traffic control centres usually follow the line, station interlocking, traction power and passenger information in separate systems and flat diagrams. Where a delay starts, why a freight train is waiting in a loop, or which train is affected when a feeder opens is hard to see at a glance. Explaining such a complex operation to an investor, a new dispatcher or a visitor is just as hard: the line is hundreds of kilometres long and events unfold in seconds.
02 · Our solution
3DSCADA brings the 624 km line together as a live map and diagrams, and each of the eight stations as its own 3D scene in the browser: Ankara's train shed, Polatlı's stone station, Manisa's clock tower below Mount Spil, İzmir Basmane's historic building by the bay. Afyonkarahisar is the most detailed, with points, signals and a traction substation. The high-speed, regional and freight trains, the station building, canopies, footbridge, catenary portals, signals and points were modelled in Blender; trains run where the simulation puts them, points turn for each route and signals show their real aspects. The line diagram, station interlocking, graphic timetable, passenger and energy panels are linked on the same screen: clicking a train, a signal or a substation selects the same object everywhere.
What the demo shows
The fictional line runs 624 km from Ankara to İzmir: Sincan, Polatlı, Afyonkarahisar, Uşak, Salihli and Manisa stations plus four freight passing points. Six high-speed sets (250 km/h), four regional trains (160 km/h) and four freight trains (100 km/h) run to a daily timetable; twelve traction substations feed the line at 25 kV 50 Hz.
Simulation
Trains move with mass, tractive effort, power and running resistance; their ETCS Level 2 movement authority comes from 5 km blocks and station signals. Automatic route setting sends stopping trains to a platform, non-stop trains along the main line and freight trains about to be overtaken into the loop. Passengers arrive at the stations by time of day and board and alight; braking trains return energy to the catenary. Delays, faults, speed restrictions and the weather affect operations realistically.
Interaction
You can switch trains to manual and stop them, ride in the cab view, turn ARS off and set routes yourself, throw points, hold a signal, add a speed restriction or open a feeder breaker and watch the effect. A panel tour and a journey tour walk through the demo step by step.
Video
Project video
Features
Key capabilities
- 14 trains on a live timetable: speed, power, delay, next stop, occupancy and ETCS movement authority
- The 624 km line on a real map of Türkiye and the world (Natural Earth), a line diagram with 5 km blocks and a time–distance graphic timetable
- Afyonkarahisar electronic interlocking: 8 points, 8 signals, ARS, manual routes and locking
- Passenger flows: waiting passengers, boarding and alighting, the departure board and train occupancy
- 12 traction substations: feeder power, catenary voltage, extended feeding and regenerative braking
- Mixed traffic: freight trains wait in passing loops to let high-speed trains overtake
- Cab view, 3D train following, 8 PTZ cameras, night IR and video analytics events
- Each of the 8 stations is its own 3D scene: its own track layout, station building, platforms, signals and live train movements
- A panel tour and a journey tour, an avatar walk, live weather, day and night, mobile support, TR/EN
12 images
Gallery
Outcomes
- km of line monitored live on one screen
- 624
- trains with realistic dynamics and a timetable
- 14
- points and signals under control
- 8 + 8
- installs — runs in the browser
- 0
Services
Related services
FAQ
Frequently asked questions
Is this a real railway line?
No. The line, timetable and every value are fictional and simulated. The interface itself is built to be connected to a real traffic control centre's signalling, interlocking, traction power SCADA and passenger information systems.
Do I need to install anything?
No. The demo runs directly in any up-to-date browser — Chrome, Edge, Firefox or Safari — and works with touch controls on phones and tablets.
How would it connect to real systems?
Train positions come from the ETCS radio block centre or GSM-R, interlocking states and commands through the relevant interface protocols, and traction power data over IEC 61850 or IEC 60870-5-104, all through an MQTT/WebSocket bridge. Commands travel back the same way, with authorisation and confirmation steps.
Can you model our own line or station?
Yes. The station track layout, points and signals, catenary, platforms and substations are modelled for each project; a station diagram and a line profile are a good starting point.
Can the 3D models be downloaded?
No. The models are loaded compressed and encrypted and are only decoded in browser memory, so there is no model file on the page to download.
Projects
Other projects

Solar Plant Digital Twin Demo
A one-to-one 3D digital twin of a sample 5 MW solar plant: 10,400 modules, 20 inverters, cameras and lighting, explored from the browser with a live SCADA panel.

3D Concrete Plant
A SCADA that runs an entire concrete batching plant from a 3D digital twin, from recipes and batching to dispatch and stock forecasting. Try the live demo, no installation needed.

Online Thermogram Monitoring
Instead of profiling a handful of sample bodies with Datapaq, the system builds a thermogram for every vehicle within 60 seconds of oven exit and reports the verdict to the PLC.
Ready to bring your project to life?
Contact our expert team and discover your custom solution.